Featured projects.

A selection of the substation engineering projects Coastal Grid has delivered.

Aerial view of the AES Bellefield solar and battery storage construction site in Kern County, California
Kern County, CA 2025
The AES Corporation

RAS engineering for the Bellefield Solar Project

Remedial Action Scheme design for Phase 1 of what will become the largest solar-plus-storage facility in the United States.

Coastal Grid delivered Remedial Action Scheme (RAS) logic design and relay configurations for the first phase of the Bellefield Solar Project, developed by The AES Corporation in California. At 2 GW when fully built out, Bellefield will be the largest solar-plus-storage facility in the United States. We supported both the utility and customer sites to bring Phase 1 online in 2025, and we continue to engineer the RAS as the project moves toward full buildout.

RASLogic DesignRelay ConfigurationSolar + StorageUtility InterconnectIPP

For additional details, see Announcement on LinkedIn.

Voltage
230 kV
Site
Kern County, CA
Year
2025
Centralized protection and control panel
Southern California 2025
Southern California Edison

Centralized protection across three vendor platforms

Validated multi-vendor interoperability for a fully digital substation initiative.

Coastal Grid supported SCE's Fully Digital Substation initiative by performing centralized protection configuration and testing for three platforms (GE, SEL, and Siemens). The project evaluated multi-element protection for a typical subtransmission substation, including transformers, feeders, buses, and circuit breakers. Testing covered protection scheme validation, interoperability, Sampled Values, GOOSE, PRP network redundancy, and PTP time synchronization. We documented results, resolved issues during testing, and delivered recommendations for future centralized protection design and deployment decisions.

IEC 61850Sampled ValuesGOOSEPRPPTPGESELSiemens
Voltage
All
Site
Southern California
Year
2025
Drafting of substation protection and automation standards
Southern California 2022 - 2023
Southern California Edison

Protection and automation standards development

Created new substation protection and automation standards, adopted utility-wide.

Coastal Grid served as the lead technical resource for protection and automation standards at Southern California Edison. We worked with all SCE engineering teams to develop new substation standards, including standard schematic and logic prints. We presented updates to the standards committee, served as subject-matter expert, and published all related documentation.

ProtectionAutomationStandardsSchematicsLogic DesignSME Lead
Voltage
All
Site
Southern California
Year
2022 - 2023
Digital substation system layout
California (lab) 2023
Major California utility (via Tesco Automation)

Fully digital IEC 61850 substation pilot

Multi-vendor digital substation validated in a full-scope lab replica.

As a subcontractor through Tesco Automation, we worked with the technology development department of a major California utility to implement a fully digital substation based on IEC 61850. The scope included developing test plans, configuring IEDs, and conducting thorough testing. In partnership with Tesco, we configured and tested the system in a lab environment designed to replicate a full distribution substation, with both relays and merging units, and a multi-vendor system to test interoperability between IEDs.

IEC 61850Merging UnitsMulti-VendorLab Validation

For additional details, see Past Projects | Tesco Automation.

Voltage
All
Site
California (lab)
Year
2023
Bulk transmission lines on the western US grid
California 2019 - current
Utility and customer interconnection clients

20+ Remedial Action Scheme projects

Approved RAS contractor delivering across utility-side CRAS and customer interconnection sites.

Coastal Grid has delivered engineering services for over 20 individual Remedial Action Scheme (RAS) projects, spanning both utility substations and customer interconnection sites. On the utility side, we are an approved RAS contractor for SCE, where we have engineered numerous projects including their critical Centralized Remedial Action Schemes (CRAS). On the customer side, we engineer the RAS that ties new generation and storage facilities into the bulk system, working directly with developers, IPPs, and EPCs. Across both sides of the meter, we deliver the full RAS lifecycle: logic design, relay and controller configuration, factory acceptance testing, and site commissioning.

RASCRASCustomer InterconnectLogic DesignCommissioningWECC RASRS
Voltage
All
Site
California
Year
2019 - current
Substation automation dataset configuration
California 2022
Southern California Edison

Ultimate Dataset Project: utility-wide IEC 61850 pointlists

Comprehensive IEC 61850 pointlists deployed across the utility's automation system.

We developed a comprehensive set of standard pointlists for SCE's latest substation automation system, based on IEC 61850. The pointlists covered all protection and automation applications across the utility's entire system. We implemented these points into the IEDs (primarily GE and SEL), upgraded relay firmware to the latest versions, and created the standard IEC 61850 SCL files.

AutomationIEC 61850SCLGESEL
Voltage
All
Site
California
Year
2022
GE relay logic configuration screenshot
California 2021 - current
Southern California Edison

Standard IED file development: 250+ files maintained

250+ standard IED configuration files updated and maintained across the fleet.

As the lead technical resource for SCE, Coastal Grid updated and maintained over 250 standard IED configuration files. Partnering with the Standards and Protection/Automation teams, we developed templates for all protection and automation devices installed in the field. Our team upgraded the files to incorporate the latest technology, researched new features, and provided implementation recommendations, with a particular focus on IEC 61850.

ProtectionAutomationStandardsIED ConfigurationTemplatesIEC 61850
Voltage
All
Site
California
Year
2021 - current
Have a project in mind?

From 4 kV to 500 kV.

Tell us about it.

Send us a message About Coastal Grid
Direct line
(805) 242-6458
Headquartered in
San Luis Obispo, CA